Roof replacement

Roof replacement: what a full reroof involves, layer by layer

A reroof is more than new shingles. The old roofing comes off, the deck is checked and repaired, new underlayment, flashing and vents go on, then the roofing, and the city inspects the work. Knowing the steps makes bids easier to compare. Tell us about your roof and we call or email you back about it.

When is it time for a new roof?

A roof is due when repairs stop holding. Typical signs are shingles that have lost their granules across whole slopes, tabs that curl or cup, cracked or brittle tile underlayment, more than one leak with no single cause, daylight or soft spots in the attic sheathing, and a roof that already has two layers. A storm can bring the date forward. If you are not sure, start with our guide on repairing or replacing a roof.

The reroof, step by step

  1. Permit. California requires a building permit to replace a roof, and the roofer usually pulls it. In Texas the city sets the rule; ask who applies and ask to see it.
  2. Protection. Tarps over plants, the yard and the driveway; a plan for the trash bin; the attic cleared of anything fragile under the work area.
  3. Tear-off. The old roofing and underlayment come off down to the deck. Tear-off shows what nobody could see from the outside.
  4. Deck repair. Rotted or delaminated sheathing is replaced. Because nobody knows how much until the old roof is off, the contract should price it per sheet.
  5. Edges and underlayment. Drip edge, an ice-and-water or self-adhered membrane where the product and code call for it (valleys, eaves, around penetrations), then the underlayment over the field.
  6. Flashing. New step and counter flashing at walls and chimneys, new pipe boots, valley metal. Reusing old flashing under a new roof is a common source of the next leak.
  7. Ventilation. Intake at the eaves and exhaust at or near the ridge, balanced, as the product maker and the code require.
  8. Roofing. Shingles, tile, metal or membrane, installed to the maker's instructions, which also decide the warranty.
  9. Clean-up and inspection. A magnet sweep for nails, gutters cleared, and the city's final inspection signed off.

California: the reroof rules to know

In California the roofer should hold a CSLB license in the C-39 roofing classification, which you can confirm on CSLB's Check A License page. A home improvement contract cannot ask for more than $1,000 or 10 percent of the price as a down payment, whichever is less, and later payments may not run ahead of the work and materials delivered. The Energy Code (Title 24, Part 6) also applies: when half or more of the roof is replaced, Bay Area homes in Climate Zones 4 and 12 need roofing that meets the cool roof rule, shown on a Cool Roof Rating Council label, and low-slope roofs carry insulation rules in most zones. Our cool roof page explains the numbers and the exemptions.

Texas: the reroof rules to know

Texas has no state roofing license, so the checks fall to you and the city: a certificate of liability insurance, a permit where the city requires one, and references. When the reroof is paid by an insurance settlement, Texas law requires a contract of $1,000 or more to say that you pay your deductible, and it is illegal for a contractor to offer to waive or absorb it. Many owners in hail country weigh impact-resistant roofing at this point, because some insurers give a credit for it; see hail damage roof repair for how the classes work.

What should a reroof contract say?

Before you sign, check the roofer too: our article on how to check a roofer in California and Texas lists what to look up and the red flags.

Comparing bids without comparing apples to oranges

Two bids can differ mostly in what they leave out. Line them up by the list above: one may include new flashing and ventilation and a per-sheet deck price; another may reuse old flashing and say nothing about decking. Ask each roofer to fill the gaps in writing. The lowest number is only the lowest price if it covers the same roof.

Living with a reroof for a few days

Tear-off is loud and dusty. Expect hammering and debris, keep pets and cars away from the drip line, and clear the attic below if dust would hurt what is stored there. Ask that the roof be dried in, with underlayment at least, at the end of each day. If you work from home, plan around the tear-off days; the rest of the job is quieter.

Planning a reroof? Tell us about the house

Tell us what the roof is doing, what it is made of if you know, and the city or ZIP. We call or email you back about it; the request is free and commits you to nothing.

Roof replacement questions

Is a permit needed to replace a roof?

In California, yes: replacing a roof requires a building permit and must meet the Energy Code's roofing rules. In Texas each city sets its own rule. Either way, ask who will pull the permit, see it before work starts, and make the final payment after the passed inspection.

What happens to the old roof deck?

It stays unless it is damaged. After tear-off the roofer walks and looks at the sheathing and replaces sheets that are rotted, delaminated or soft. Because the amount is unknown until then, a good contract gives a price per sheet and asks you to see or photograph the bad ones.

Should vents and skylights be redone during a reroof?

Usually the flashing around them should be, since old flashing under new roofing is a common leak source. An old skylight may be worth replacing while the roof is open. Ask the roofer to list each penetration in the contract and say what will happen to it.